Industries · Central and local government
Central and regional offices, counties and municipalities have to keep working in a crisis. A link failure, a power cut or a move to a backup location are exactly the moments when public administration still has to operate and coordinate. We design backup communications prepared for these scenarios – and rehearsed.
Challenges
A single link, or several links running along the same route – and no plan B.
Backup communications that stop working together with the power grid.
Getting work up and running quickly in another building or at a temporary command post.
Meetings and information exchange between public offices, emergency services and partner organisations.
Reference architecture
An illustrative architecture – it does not describe any specific client's deployment. We take into account the tasks arising from the Polish civil protection and civil defence system (OLiOC).
Fibre or a fixed line – with an analysis of the physical route.
Starlink as an independent backup medium, optionally as private transmission. Starlink for organisations
A third medium from the operator with the best coverage at the location, confirmed by measurement.
Offices, backup locations and the crisis management centre inside the organisation's network – through a private Starlink PNI network, bypassing the public Internet. Starlink PNI L2/L3
Automatic failover and priorities for critical services. SD-WAN and multi-WAN
A meeting platform under the organisation's control, not dependent on a single cloud service. Secure video conferencing
UPS and a generator with calculated autonomy, written instructions and regular exercises.
A mobile communications node for a backup location. Mobile communications systems
Motorola TETRA radios for crisis management teams, with an installation on the centre's building. Motorola TETRA radios
How we start
Which systems and workstations must keep running, and within what time.
Links, power, equipment and dependencies on external services.
A proposed solution together with an exercise scenario.
Yes, if it is designed to: with a suitable medium (e.g. LEO satellite), priority for video traffic and a meeting platform that does not depend on a single cloud service. We confirm this with measurements and a test.
We start with priorities: which workstations and services must keep running. Then we calculate the power budget of every communications component, choose backup power and verify the solution in a controlled test.
Yes – we provide information on available technologies and their limitations, in line with the rules of the Polish Public Procurement Law (Prawo zamówień publicznych).
Together we will establish what must keep working, where the weak points are and what the action plan should look like in the event of a failure.